Manufacturing & IoT · Solution we build

Manufacturing Execution System (MES)

Real-time production tracking from work order to finished goods. A manufacturing execution system tracks work orders, machine status, production counts, quality checks and downtime on the shop floor in real time, connecting operations with your ERP.

Manufacturing Execution System (MES): Real-time production tracking from work order to finished goods. Work order tracking Machine connectivity 16–28 weeks typical timeline
Typical timeline16–28 weeksfor a first production release
PlatformsShop-floor tablets, TV dashboards, web
IndustryManufacturing & IoTDiscrete manufacturers, Auto-component suppliers
Key features

What your Manufacturing Execution System (MES) includes

01

Work order tracking

Release, track and close work orders by line and shift.

02

Machine connectivity

Live machine status and counts via PLC / IoT gateways.

03

OEE dashboards

Availability, performance and quality per machine.

04

Downtime reasons

Operators log reasons on shop-floor tablets.

05

Quality checks

In-process inspections and non-conformance tracking.

06

Traceability

Batch and serial genealogy from raw material to dispatch.

Who it's for

  • Discrete manufacturers
  • Auto-component suppliers
  • Process industries
  • Contract manufacturers
  • Higher OEE
  • Less unplanned downtime
  • Full product traceability
  • Paperless shop floor

Business benefits

  • Higher OEE
  • Less unplanned downtime
  • Full product traceability
  • Paperless shop floor
Technology stack

Built on proven, scalable tech

Typical stack shown. We choose technologies based on your scale, team and existing systems.

ReactNode.jsInfluxDBOPC-UA / MQTTSAP / ERP APIs
How we deliver

From discovery to launch

STEP 01

Discovery

Workshops to understand your workflows, users and must-have features.

STEP 02

Design

Wireframes, clickable prototypes and a technical architecture you approve.

STEP 03

Build & test

Agile sprints with demos, code reviews and automated QA.

STEP 04

Launch & support

Cloud deployment, training, monitoring and ongoing improvements.

FAQ

Frequently asked questions

How long does it take to build a manufacturing execution system (mes)?
A typical first version takes around 16–28 weeks, depending on the features, integrations and platforms you need. We share a detailed timeline after the discovery phase.
Can the features be customised for our business?
Yes. Every solution is built for your workflows. The features on this page are a starting point; we add, remove or adapt modules based on your requirements.
Do we need new machines to use an MES?
No. Older machines can be connected with low-cost IoT sensors and gateways.
Who owns the source code?
You do. On project completion the source code and intellectual property are handed over to you, and we can continue with support and enhancements if you wish.
Start a project

Tell us what you're building. Get a plan in 24 hours.

Share a few details and a senior engineer (not a salesperson) will reply with questions, a rough timeline and a fixed-price estimate.

No spam, no obligation. NDA available on request.